Short-Circuit and Earth Fault Indicators : Lodestar PT3
office@a3.energy
+7 499 450-55-07
arabic language

Lodestar PT3

Description

Lodestar PT3 fault indicator is intended for detection of fault localization on overhead and cable power distribution lines of 6-35 kV. The indicator can operate in networks with insulated and resistance neutral. The device is mounted in switchgear and control gear cell on the control board.

Lodestar PT3 abilities:

  • phase-to-phase short-circuits and phase-to-ground faults recording with separation of fault types;
  • damaged phase detection;
  • transmission of information to dispatching and telemechanics system by means of adjustable relay outputs or RS-485 interface;
  • saving up to the last 10 faults in the event log and time tag;
  • fault indication by switching on one or several appropriate LEDs;
  • the indicator is powered from DC or AC voltage source 220/110 V and 220 V respectively;
  • standby power supply of LEDs (at the time of fault indication);
  • control of standby battery charge level;
  • changing of setpoints by DIP switch and client software.

The sensors of Lodestar PT3 fault indicator (based on the Rogowski coil) are mounted directly on cable phase conductors and transmit data to the indicator box. The indicator is installed on the board of relay compartment of switchgear and control gear cell.

Lodestar PT3 Technical specifications

Parameters Values
Events
Types of registered faults - 2- and 3-phase short circuits
- phase–to-ground faults
- separation of fault types
- damaged phase detection at short circuits
General description of the Device
Voltage class of overhead and cable power
distribution lines
6-35 kV
Visual fault indication LEDs with high intensity brightness
Number of last faults stored in the internal memory 10
Power supply Powered from:
- an auxiliary services supply with any type of voltage =220 V, = 110 V or from the mains ~ 220 V
- standby power supply (lithium battery) for fault indication (LEDs blinking time is more than 900 hours)
Fault Indication Reset by - the external command (by closing of dry contacts (voltage free output relay contacts)
- timer
- button on the Device
Communication RS-485 MODBUS protocol (in option)
Trigger control - visual
- on MODBUS protocols (if the power supply is available)
- relay output
Mean time between failures At least 110 000 hours
Additional features - changing of setpoints by DIP switch
- RS-485 (in option)
Parameters
Current threshold range (short-circuits) 200 ÷ 2000 A
Current threshold range (phase-to-ground fault) 10 ÷ 160 A
Fault observation time at phase-to-ground fault 60 ÷ 300 ms
Inrush current response time 0.02 s
Fault observation time at short-circuit 40 ÷ 300 ms
Preparing for reactivation no more than 30 s
Design
Installation place in switchgear and control gear cell, on the control board
Sensors sensors based on Rogowski coil
Temperature range standard from -40° С to +50° С
International Protection Marking IP 65
Impact of external climatic factors S4 design group according to the requirements and Moderately Cold Climate design of placement category 3.1 according to IEC 721-2-1, but for operation at ambient air temperature from -40 to +50°C
Impact of mechanical factors M7 design according to IEC 721-3-3-87, design group N2 according to the requirements

Catalogue

english language catalogue

Catalogue A3 (english) Catalogue A3 (english) - DOWNLOAD 

Our customers

Logo LUKOIL Logo BESK Logo ROSSETI Logo ROSNEFT Logo TRANSNEFT Logo FSK Logo SUEK
Facebook ANTRAKS Group Linkedin ANTRAKS Group Youtube ANTRAKS Group